Chennai's current airport cannot carry the region's long-term growth by itself. The official files show how four sites were compared, why Parandur came out ahead, and what tradeoffs now have to be solved on the ground.

Aircraft wing above clouds
Second-airport capacity is the starting point

Final airport capacity

100M/year

The long-term passenger target after all phases

Project area

5,368.93 acres

Land identified for the proposed airport

Sites compared

4

Parandur, Pannur, Thiruporur, and Padalam

Estimated cost

₹29,143.95 cr

Block cost estimate across four phases

The short version

The decision starts with capacity, then becomes a site-selection problem.

Parandur is being planned as Chennai's second airport, with a final target of 100 million passengers a year. The aviation argument is straightforward: Chennai's current airport has limited room to expand, while the city and its industrial belt are expected to keep growing.

The harder question was where to place that new capacity. Tamil Nadu and AAI compared Parandur, Pannur, Thiruporur, and Padalam. Parandur was finalized because it scored better on usable airspace, runway orientation, land availability, fewer man-made aviation obstacles than Pannur, lower stated displacement than Pannur, and access to the Chennai-Bengaluru Expressway corridor.

That does not make Parandur impact-free. The official boundary includes farmland, villages, roads, government land, and water bodies. The real story is therefore two-sided: why Parandur won the airport-location contest, and what the state must now prove on land, water, and resettlement.

Project map

See the airport footprint beside the alternative sites.

The red shape is the proposed airport boundary. The circular rings show the broader comparison areas for Parandur, Pannur, Thiruporur, and Padalam. Use the buttons to isolate each site.

What the maps reveal

The airport boundary

This sheet shows the boundary coordinates of the proposed airport footprint.

Open source sheet
The airport boundary preview
Where the project sits

Land use

The same land looks different depending on the record.

Revenue records classify more than a quarter of the project area as water bodies and irrigation tanks. The drone survey records a smaller visible surface-water area. Both numbers matter: one describes legal and land-record classification; the other captures what was visible during the survey.

Revenue records

Irrigated agriculture 1,031.21 ha / 47.46%
Water bodies and tanks 576.74 ha / 26.54%
Dry agriculture 355.22 ha / 16.35%
Government / poramboke land 173.00 ha / 7.96%
Roads and village built-up area 36.56 ha / 1.68%

Drone survey

Agriculture 1,219.83 ha / 56%
Dry land 705.33 ha / 32%
Surface water bodies 126.37 ha / 6%
Grazing land 57.61 ha / 3%
Settlements, roads, wasteland 63.59 ha / 3%

Why Parandur won

Parandur was not chosen because it had no problems. It was chosen because the other sites had bigger aviation problems.

The official comparison is blunt: Chennai's second airport needs clean airspace, a workable runway orientation, enough land for long-term expansion, and road access to the demand centres west of the city. On those tests, Parandur beat the other three options even though its land and water impacts remain serious.

Rejected early

Padalam

The documents place Padalam inside the restricted Tambaram Local Flying area controlled by the Indian Air Force. They also flag the Chengalpattu firing range nearby. That makes it a poor airport site before land or cost is even considered.

Operationally constrained

Thiruporur

Thiruporur sits close to the Tambaram restricted flying area, with the Chengalpattu firing range to the west and Kalpakkam nuclear plant constraints to the south. The report says the practical runway orientation would conflict more with Chennai airport traffic.

Feasible but weaker

Pannur

Pannur survived the first screening, but the documents identify several Extra High Tension towers and operating industries around the site. They also say Pannur would displace more families than Parandur and may need additional land for navigation aids.

Finalized

Parandur

Parandur had the strongest package in the official comparison: better fit for the preferred 07/25 runway orientation, fewer man-made aviation obstacles than Pannur, lower stated displacement than Pannur, large contiguous land availability, and stronger access to the Chennai-Bengaluru Expressway corridor.

Runway logic

The documents say the preferred orientation is 07/25, parallel to Chennai airport's main runway. Padalam and Thiruporur were weaker because their practical orientation created greater conflict with existing Chennai airport traffic.

Obstacle logic

Pannur was feasible, but not clean. The reports point to EHT towers, operating industries, and likely additional land needs for navigation aids. Parandur had fewer man-made aviation obstacles in the official reading.

Access logic

Parandur sits closer to the Chennai-Bengaluru Expressway corridor, which strengthens the case for passenger access, cargo movement, and future airport-linked development west of Chennai.

Buildout

The airport is designed to grow in four waves.

The first phase is planned for 20 million passengers a year. The fourth phase takes the airport to the 100 million passenger target.

2029-2035

Phase 1

20 million passengers

2036-2042

Phase 2

50 million cumulative

2043-2046

Phase 3

70 million cumulative

2047-2052

Phase 4

100 million cumulative

Villages and water

The project boundary cuts through a lived landscape.

The report says around 1,005 families are likely to be affected. It also identifies existing water channels crossing the project area and proposes to redevelop Nelvoy Eri as a storage tank. In plain terms: the airport can only work if the land and water plan works.

Villages listed in the project table

Paranthur AParanthur BValathurPodavurNelvoyThandalamMadapuramThodurSingilipadiGunakarapakkamEdaiyarpakkamAkkammapuramEganapuramMahadevi Mangalam

Timeline

How Parandur moved from option to priority project.

Select a date to follow the project from site screening to the current fast-track phase.

Rural landscape at golden hour

Mar 2026 / Fast track

Tamil Nadu declares Parandur airport a special project

March reporting said the state notified the airport as a special project under the Tamil Nadu Land Consolidation framework, raising the stakes around water bodies and land conversion.

The real test is execution.

The documents make a strong aviation case for Parandur: more capacity, a large site, better long-term planning, and a cleaner runway orientation than some alternatives. But the same documents show why this project cannot be judged only as transport infrastructure.

For residents, farmers, planners, and anyone downstream of the water system, the questions are more practical: who moves, who is compensated, where the water goes, how flood risk changes, and whether the replacement drainage plan performs in a real monsoon.